Wonky  Contributor's Pick!       
Well, the new switch and associated track still needs to be straightened out and leveled before it gets connected to Track #2. Workmen have been busy spreading ballast on a cold and windy day. The new alignment is scheduled to be put in place on February 10 and 11, 2007. For additional details of the ongoing track work at St. Denis, see my albums, "St. Denis, MD--High-speed switch assembly" and "CSX track maintenance." [Reposted 01/28/2007]
Date: 1/19/2007 Location: Saint Denis, MD   Map Show Saint Denis on a rail map Views: 235 Collection Of:   George C Johnson
Author:  George C Johnson
Wonky
Picture Categories: This picture is part of album:  St. Denis, MD--New alignment
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=637032